Informasi Seminar

PRODUCTION OPERATION MANAGEMENT FOR MANAGERS

PRODUCTION OPERATION MANAGEMENT FOR MANAGERS

Bandung | 28 – 30 April 2013 | IDR  8.750.000,- /Participant
Bandung | 25 – 27 June  2013   | IDR  8.750.000,- /Participant
Bandung | 22 – 24 Oktober  2013 | IDR  8.750.000,- /Participant
Bandung | 17 – 19 December  2013 | IDR  8.750.000,- /Participant

 

 

OBJECTIVES :
After participate in thid course, the participants will be able and cappable to :

  • Understand the basic concept of oil and gas handling processes and facilities, and how to operate this technology in field application.
  • Diagnostic of oil and gas reservoir performance under actual drive mecanism and future performance with current handling processes.
  • Analyze the production potential of reservoir under with actual handling system processes and to plan the better development processes according to reservoir capacity.
  • Understand the fundamentals of microscopic and macroscopic aspects and phenomena of oil and gas handling processes.

AUDIENCE:
No specified  (Operator/Sr. Operator/Engineer or Non Engineer)

SASARAN BELAJAR :
Setelah menyelesaikan kursus ini diharapkan peserta dapat :

  • Memahami prinsip-prinsip dasar perhitungan dan melakukan optimisasi pada saat operasi produksi sumur-sumur minyak, gas dan reservoir panas bumi dilaksanakan, pengembangan pelaksannaan optimisasi produksi ini untuk meningkatkan kinerja produksi sumuran dan lapangan.
  • Melakukan diagnosis sederhana dan memengerti penyelesaian permasalahan dalam operasi produksi sumur-sumur minyak dan bas bumil.
  • Membuat analisis sederhana terhadap data sumuran minyak, gas dan panas bumi ,melakukan peramalan kinerja dan merencanakan pengembangn operasi produksi
  • Melakukan perhitungan-perhitungan kuantitatip sederhana dari seluruh data perolehan data tubing, flowline, choke, perforasi, gravel-pack, sub-surface savety valve pada sumuran, merencanakan pengembangannya dengan memperhitungan kemampuan masing-masing sumuran.
  • Mempergunakan pengetahuan operasi produksi untuk keperluan penyelesaian permasalahan sumur seperti : pada saat penyemenan, penanganan scale, pasir, korosi dan damage yang mungkin terjadi pada sumuran minyak dan gas bumi.
  • Memahami prinsip-prinsip dasar perancangan : penyemenan, workover, stimulasi sumuran dengan  pengasaman dan perekahan hidrololik, perencanaan work over dan lain-lain

PRE-REQUISITE :
Latar belakang  : Operator, Senior Operator, Engineer/Non Engineer

MATERI KURSUS :

  • Geologic Considerations in producing Operation
  • Introduction
  • Sandstone Reservoirs
  • Geologic Factors Affecting Reservoir Properties in Sandstone
  • Application of Geologic concepts in Specific Sandstone
  • Carbonate Reservoirs
  • Application of Geologic Concepts in Carbonate Reservoirs
  • Reservoir Considerations in Well Completions
  • Introduction
  • Hydrocarbon Properties of Oil and Gas
  • Recommendations of Obtaining Good Test Data
  • “Eyeball” Interpretation of Pressure Charts
  • Primary Cementing
  • Introduction
  • Cementing Materials
  • Cement Additives
  • Cement Bonding
  • Flow Properties of Primary Cements
  • Displacement Mechanics
  • Cost of Primary Cementing
  • Special Problem Situations-New Developments
  • Primary Cementing Practices
  • Well Completion Design
  • Factors Influencing Well Completion Design
  • Conventional Tubular Configuration
  • Unconventional Tubular Configurations
  • Sizing Production Tubular
  • Completion Interval
  • Permanent Well Completions (PWC)
  • Tubingless Completion
  • Tubing Strings,Packers,Subsurface Control Equipment
  • Tubing Strings
  • Steel Grades
  • Tubing Connections
  • Makeup of API Threaded connection
  • Design of Tubing Strings
  • High Strength Tubing
  • Physical Properties of Steel
  • Sensitivities of High Strength Tubing
  • Tubing Inspection
  • Tubing Handling Practices
  • Equipment for Use With-Strength Tubing
  • Tubing Running Practices
  • API Publication List
  • Packers and Subsurface Control Equipment
  • Production Packers
  • Subsurface Control Equipment
  • Perforating Oil and Gas Wells
  • Introduction
  • Types of Perforators
  • Evaluation of Perforator Performance
  • Factors  Aftecting Gun Perforating Results
  • Perforating in a Clean Fluid with Differential Pressure Into Wellbore
  • A Comparison between the GEO-VANN System and Other Perforating Methods in Wells Equipped with Packers
  • Completion and Workover Fluids
  • Functions-Requirements-Selection Criteria
  • Formation Damage Related to Solids
  • Oil Fluids-Practical Application
  • Conventional Water-Base Mud
  • Oil Base or Invert-Emulsion Muds
  • Foam
  • Perforating Fluids
  • Packer Fluids
  • Well Killing
  • Through-Tubing Production Logging
  • Introduction
  • Logging Device
  • Application of Through-Tubing Production logging
  • Field Examples of Production Logging Techniques
  • Primary Cement Evaluation
  • Problem Well Analysis
  • Problem Wells
  • Problem Well Analysis Checklist
  • Parafin and Asphaltene
  • Introduction
  • Paraffin and Asphaltene Chemistry
  • Deposition Mechanisms
  • Removal of Wax Deposits
  • Preventing or Decreasing Wax Deposition
  • Design of Wax Control
  • Squeeze Cementing-Remedial Cementing
  • Introduction
  • Theoretical Considerations
  • Practical Considerations
  • Special Squeeze Cementing Situations
  • Planning a Squeeze Cement Job
  • Normal Operational Procedures
  • Other Operational Procedures
  • Plug-Back Operations
  • Special Cement Systems
  • Sand Control
  • Introduction
  • Reduction of Drag Force
  • Mechanical Methods of Sand Control
  • Practical Considerations in Gravel Packing
  • Use of screen Without Gravel
  • Resin Consolidation Methods
  • Formation Damage
  • Introduction
  • Basic Causes of Damage
  • Classification of Damage Mechanisms
  • Reduced Absolute Permeability
  • Increased Fluid Viscosity (Emulsion)
  • Diagnosis of Formation Damage
  • Surfactants for Well Treatments
  • Characteristics of Surfactants
  • Use and Action of Surfactant
  • Formation Damage Susceptible to Surfactant Treatment
  • Preventing or Removing Damage
  • Well Stimulation With Surfactants
  • Increasing Effectiveness of Rod Pumping
  • Prevention of Well Damage
  • Acidizing
  • Acids Used in Well Stimulation
  • Acid Additives
  • Carbonate Acidizing
  • Acidizing Techniques for Caronat Formations
  • Sandstone Acidizing
  • Potential Safety Hazard in Acidizing
  • Hydraulic Fracturing
  • Introduction
  • Mechanics of Fracturing
  • Production Increase from Fracturing
  • Propping the Fracture
  • Frac Fluids
  • Frac Job Design
  • Frac Job Evaluation Techniques
  • Scale Deposition,Removal,and Prevention
  • Introduction
  • Causes of Scale Deposition
  • Prediction and Identification of Scale
  • Scale Removal
  • Scale Prevention
  • Corrosion Control
  • The Corrosion Process
  • Detection and Measurement of Corrosion
  • Corrosion Control

INSTRUKTUR :
1.     Dr.Ir. Sudjati Rachmat, DEA

ASISTEN :
1.     Ir. Radintya Danas, MS

VANUE AND DATE
Vanue  :

  • Hotel Golden Flower, Bandung
  • Hotel Savoy Homann Bandung

Date :

  • 28 – 30 April 2013
  • 25 – 27 June  2013
  • 22 – 24 Oktober  2013
  • 17 – 19 December  2013

INVESTATION

  • IDR  8.750.000,- /Participant Non residential.
  • Fir send 3 participant from the same company IDR. 8.250.000,-/participant.

FACILITIES
Training Kit

  • Soft Copy Material Training On Flashdisk 4GB.
  • Coffee Break & Lunch
  • Certifikat
  • Souvenir
  • Additional Program (optional)

 

Post a Comment